Screen Protector Installation Instructions

Choose the correct product path before you begin. Confirm the material, device model and supplied installation kit, then follow the matching preparation and application sequence.

Prepare, Align and Apply

01 · Confirm Fit

Match the protector, device model, screen position and installation frame before removing any liner.

02 · Clean the Screen

Power off the device. Remove grease and dust with the supplied cleaning tools in a clean, well-lit area.

03 · Align Carefully

Use the speaker, camera and screen edges as reference points. Keep adhesive surfaces free from contact.

04 · Apply & Inspect

Lower the glass evenly, allow adhesion to spread and press remaining air toward the nearest edge.

Do not force a mismatched protector. Stop if openings, borders or curved edges do not align with the device.

Apply Flexible Film Without Stretching

01 · Identify the Layers

Confirm the installation side, release liners and any positioning sections before peeling.

02 · Clean & Position

Clean the screen thoroughly and align the film with the device edges, camera and speaker openings.

03 · Apply in Sections

Hold the film in position and use the supplied squeegee to apply one section at a time without pulling the material.

04 · Finish the Edges

Work remaining air outward. Recheck curved edges and allow the film to settle according to the supplied product guidance.

Material systems differ. Do not add water, heat or chemicals unless the exact JJT film instructions require them.

Position First, Cure Only After Inspection

01 · Verify the Kit

Confirm the UV film type, device, adhesive system, curing tool and supplied protection accessories.

02 · Protect Openings

Follow the supplied kit guidance for speakers, buttons and other openings before applying adhesive or film.

03 · Align & Inspect

Apply the film evenly and inspect alignment, bubbles and adhesive coverage before curing.

04 · Cure as Specified

Use only the curing time and sequence supplied for the exact JJT product, then inspect edges and touch response.

Do not guess curing time. UV products and lamps vary. Obtain the current product-specific instruction sheet before installation.

First Setup Checklist

01 · Check the Model

Confirm the machine model, power adapter, accessories, voltage and shipping condition.

02 · Prepare the Machine

Place it on a stable surface with enough feed space. Remove transport protection according to the manual.

03 · Connect & Update

Follow the model-specific manual for power, network, account and template-update setup.

04 · Test Before Production

Use approved film and a test template. Confirm alignment and cutting result before processing customer material.

Use the model-specific manual. Blade depth, pressure, firmware and reset procedures must not be copied from another machine.

Need Product-Specific Instructions?

Send the product name, material, machine model and device model. Photos of the packaging label help the team identify the correct version.